Shelly / Guide
Shelly guide

What-if: price, waste and outage levers

A quick scenario model, the same maths as the Excel scenario sheet, for testing an idea before trying it.

At a glance

How it works

  1. Volume change = price change × elasticity.
  2. New sales = sales × (1 + price change) × (1 + volume change).
  3. New GM % assumes unit costs stay the same.
  4. Uplift = new GM − base GM + waste saving + margin on recovered delivery sales.

Method & formulas

Elasticity
% change in volume ÷ % change in price. −1.2 means a 1% price rise loses about 1.2% of volume

How to read it

Limits & safeguards

Ask Shelly

What if we put prices up 3%?

Type or say these in the chat on the main page.

Related